Ekiden Leg Four

Ekiden Leg Four
Canoe Docks 5.9 km

Leg updates will be available as we design them from our new race venue.

Route Summary

This leg begins the same as legs one and two but turns right before the pedestrian bridge and heads under Banff Avenue on the path. Runners will be directed onto Bow Avenue until the Canoe Dock parking lot where they will do a loop on the pathway at the end of the road and then return via the pathway. They continue under the Banff Avenue Bridge, onto Muskrat Street and return to the finish on the same route as leg one and two.

Leg Four Map

April 15, 2018

April 21, 2018

June 9, 2018

June 23, 2018

October 13, 2018

November 12, 2017